Back to Awards

Whale Cove Arena Ice Systems Upgrade - 2015

Accutech Engineering Inc.

The community of Whale Cove required additional activities for their youth, and a zero impact on their operating budget. The project involved the renovation of an existing gravel floor arena. Accutech designed a renovation that will extend the hockey season by four months, and provide a building available for year-round use free from summer’s mosquitos and gravel dust. The design has three main components; a concrete floor, a thermosyphon refrigeration system and a ventilation system. Accutech Engineering delivered a simple, elegant, sustainable solution that helps the people of Whale Cove for virtually zero operating cost increase.

© 2018 Association of Consulting Engineering Companies - Manitoba

Winnipeg Website Design by ViewSource Media