Back to Awards

Waverly West Arterial Roads Project - Part III - 2015

Dillon Consulting Limited

The Waverley West Arterial Roads Project (WWARP) – Part III extends Kenaston Boulevard from Bishop Grandin Boulevard to the Perimeter Highway, relieving congestion on adjacent roadways, servicing the new Waverley West neighbourhoods, and creating a new north-south economic route in southwest Winnipeg. Following Dillon Consulting’s multi-discipline design and construction administration of the project, over 40 lane-kilometres of high speed roadway and 5.5 kilometres of active transportation paths were opened to the public in November 2014, including a two lane overpass structure. The WWARP project is poised to provide much needed transportation capacity for the growing southwest part of Winnipeg.

© 2018 Association of Consulting Engineering Companies - Manitoba

Winnipeg Website Design by ViewSource Media