Back to Awards

City of Dryden Design and Construction of Canada's First LEED Silver Sewage Treatment Plant - 2018

Stantec Consulting

Faced with an aging sewage treatment plant with limited capacity and difficulty meeting effluent regulations, the City of Dryden selected Stantec to design a new LEED sewage treatment plant for future needs. Addressing challenging soil conditions, proximity to the river, and limited site availability, Stantec developed a compact design by integrating administration and process areas on top of the treatment tanks, satisfying the objective for a single LEED facility. This innovative approach achieved 50% energy cost savings, enabled greenhouse gas reductions by 377.5 tons of CO2/year, and lowered water use by 44.8%, resulting in Canada’s First LEED Silver Sewage Treatment Plant.

© 2018 Association of Consulting Engineering Companies - Manitoba

Winnipeg Website Design by ViewSource Media