Back to Awards

MCW/AGE Power Consultants - 2019

Bipole III Converter Buildings

The Manitoba Bipole III project is a cornerstone of the Manitoba Hydro Transmission system connecting remote hydro generation resources to load centers in the south. The Converter buildings at either end of the High Voltage Direct Current (HVDC) transmission line, built by the Siemens/Mortenson Consortium, and designed by MCW Consultants are the heart of the system. The engineering challenges included extremely complex design, scheduling issues, and technical coordination between three concurrent design efforts.